The pipes used in oil pipelines are mainly carbon steel pipes, which can be divided into Seamless Steel Pipes and Welded Steel Pipes according to their manufacturing processes. Welded steel pipes can be divided into two types: butt welded steel pipes and drop welded steel pipes.
Spiral welded pipes are produced from hot rolled coils. The rolling process of the hot strip mill has a series of advantages, and has the ability to obtain the metallurgical process to produce high quality pipeline steel. Coils tend to have lower alloy content than similar grades of steel, which also improves the weldability of spiral welded pipes. Since the rolling direction of the spiral welded pipe is not perpendicular to the axis of the Steel Pipe (the clipping depends on the helix angle of the steel pipe), while the rolling direction of the steel plate of the straight seam steel pipe is perpendicular to the axis of the steel pipe, the crack resistance of the spiral welded pipe material Better than straight seam steel pipe. The helix angle of the spiral welded pipe weld is generally 50-75 degrees, so the synthetic stress at the spiral welded seam is 60-85% of the main stress of the straight seam welded pipe. Under the same working pressure, the wall thickness of the spiral welded pipe of the same diameter can be reduced compared with that of the straight seam welded pipe.
Product Name | Welded Steel Pipe |
Standard | ASTM |
Material | ASTM A691 Gr 11, ASTM A691 Gr.91, ASTM A691 9cr, ASTM A691 5cr, ASTM A691 1 1/4cr Cl22, ASTM A691m, ASTM A691 Gr.5cr Cl22, ASTM A691 Cm70, ASTM A691 Class 22, ASTM A691 Class 42, ASTM A691-91, ASTM A691 Grade 2.1/4cr, ASTM A691 11/4cr Cl22 |
Technology | Hot Rolled ,Cold Rolled, |
Chemical Composition | C:≤0.15% Si:≤0.5% Mn:0.3~0.6% P≤:0.25% S≤:0.30% Cr:4-6% Mo:0.45-0.65% |
Mechanical Property | Tensile Strength/MPa:415-585 Yield Strength/MPa:≥205 Elongation(%):≥18 |
Tolerance | Control with in the standard, OD:+/-1%, WT:+/-5% |
Application | For low pressure fluids in engineered transportation systems |
Payment Terms | 1.FOB 30%T/T,70% Before shipment 2.CIF 30% Pre-payment , Balance must be paid before shipment 3.Irrevocable 100% L/C at sight |
Third Party Inspection | SGS ,BV, MTC |
Advantages | 1.Short delivery time 2.Quality assurance 3.Competitive price, 4.Free Sample |
Delivery Time | Within 25 days after receipt of advance payment |
Our products aye widely used in water engineering,petrochemical industry,chemical industry,electric power industry,agricultural irrigation,urban construction.
Used for liquid conveying:water supply and drainage.For gas transport:gas,steam,liquefier petroleum gas.
For structural use:as pile pipe,as a bridge;Pipes for wharves,roads and building structures.
Q: Are you a manufacturer?
A: Yes, we are steel pipe manufacturer, we have our own factory, located in Shandong, China.
Q: Can we visit your factory?
A: After a warm welcome to your schedule, we will pick you up.
Q: Do you have quality control?
A: Yes, we can accept BV and SGS three inspections.
Q: Can you arrange delivery?
A: Of course, we have permanent freight forwarders who can get the best price from most shipping companies and provide professional service.
Q: How long is your delivery time?
A: Generally 7-14 days if the goods are in stock. Or 25-35 days if the goods are not in stock, it is based on the quantity.
Q: How can we get the offer?
A: Please provide the specifications of the product, such as material, size, shape, etc., so that we can provide the best quotation.
Q: Can we get some samples? Is there a fee?
A: Yes, you can get samples available in our stock. Real samples are free, but customers need to pay for shipping.
Q: How do you keep our business in good long-term relationships?
A: 1. We keep good quality and competitive price to ensure the benefit of our customers.
2. We respect every customer as our friend, we sincerely do business with them and make friends, no matter where they come from.