ASTM A53 GR.B Fertilizer Steel Tube.High pressure Seamless Steel Pipes for chemical fertilizer equipment (GB6479-2000) is a High-Quality Carbon Structural Steel and alloy steel Seamless Steel Tube suitable for chemical equipment and pipelines with working temperature of - 40 ~ 400 ℃ and working pressure of 10 ~ 30mA. Application: it is suitable for chemical equipment and pipelines with working temperature of - 40 to 400 ℃ and working pressure of 10 to 32Mpa. It is suitable for transporting chemical media such as synthetic ammonia, urea and methanol.
Special tube for chemical fertilizer: GB6479-2000 (Seamless Steel Pipe for high pressure chemical fertilizer equipment). It is mainly used for conveying high temperature and high pressure fluid pipeline on chemical fertilizer equipment. The representative materials are 20, 16Mn, 12CrMo, 12cr2mo, etc.
Special pipe for chemical fertilizer (gb6479-86) is a high-quality carbon structural steel and alloy steel seamless Steel Pipe suitable for chemical equipment and pipelines with working temperature of - 40 ~ 400 ℃ and working pressure of 10 ~ 30mA
High pressure alloy pipe for fertilizer equipment (gb6479-86) is a high-quality carbon structural steel and alloy steel seamless steel pipe suitable for chemical equipment and pipelines with working temperature of - 40 ~ 400 ℃ and working pressure of 10 ~ 30mA.
Product Name | ASTM A53 GR.B Fertilizer Steel Tube |
Standard | ASTM A53 GR.B |
Material | GB:10# ASTM :A135 GR.A JIS:G3454 STPG38 Din :1626 ST37 |
Technology | Hot Rolled ,Cold Rolled,Cold Drawn,Hot Expended |
Chemical Composition | C:0.17~0.23% Si:0.17~0.37% Mn:0.35~0.65% Cr≤:0.25% Ni≤:0.30% Cu≤:0.25% Fe:98.59~97.5% |
Mechanical Property | Tensile Strength/MPa:≥410 Yield Strength/MPa:≥245 Elongation(%):≥25 |
Tolerance | Control with in the standard, OD:+/-1%, WT:+/-5% |
Application | Widely used in automobiles, motorcycles, gas springs, hydraulic machinery, construction machinery and refrigeration industry |
Payment Terms | 1.FOB 30%T/T,70% Before shipment 2.CIF 30% Pre-payment , Balance must be paid before shipment 3.Irrevocable 100% L/C at sight |
Third Party Inspection | SGS ,BV, MTC |
Advantages | 1.Short delivery time 2.Quality assurance 3.Competitive price, 4.Free Sample |
Delivery Time | Within 25 days after receipt of advance payment |
1. The main production process of hot-rolled seamless steel pipe (main inspection process):
Tube blank preparation and inspection→tube blank heating→piercing→tube rolling→steel reheating→fixed (reduced) diameter→heat treatment △→finished tube straightening→finishing→inspection (non-destructive, physical and chemical, Taiwan inspection)→warehousing
2. The main production process of cold-rolled (drawn) seamless steel pipes:
Billet preparation→pickling lubrication→cold rolling (drawing)→heat treatment→straightening→finishing→inspection
Our products aye widely used in water engineering,petrochemical industry,chemical industry,electric power industry,agricultural irrigation,urban construction.
Used for liquid conveying:water supply and drainage.For gas transport:gas,steam,liquefier petroleum gas.
For structural use:as pile pipe,as a bridge;Pipes for wharves,roads and building structures.
Q: Are you a manufacturer?
A: Yes , we are a seamless steel pipe manufacturer, We have own factory, which is located in Shandong,China. We have a leading power in producing and exporting hot rolled seamless steel pipe,cold rolled seamless steel pipe,cold drawn seamless steel pipe and Alloy Seamless Steel Pipe etc. We promise that we are what you are looking for.
Q:Can we visit your factory ?
A:Warmly welcome once we have your schedule we will pick you up .
Q: Do you have quality control?
A: Yes, we can accept BV, SGS third inspection .
Q: Can you arrange the shipment?
A: Sure, we have permanent freight forwarder who can gain the best price from most ship company and offer professional service.
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is 25-35 days if the goods are not in stock, it is according to quantity.
Q:How can we get the offer?
A:Please offer the specification of the product,such as material,size,shape,etc.So we can give the best offer.
Q:Can we get the some samples?Any charges?
A:Yes,you can get available samples in our stock.Free for real samples,but customers need to pay the freight cost.
Q: How do you make our business long-term and good relationship ?
A: 1.We keep good quality and competitive price to ensure our customers' benefit.
2.We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.